New addition looking southeast 01-02-2007 |

Glass blocks outside Wellness & Fitness Center 01-02-2007 |

Glass blocks in entry area of new addition 01-02-2007 |

Taken inside pool area looking back towards Jason Metz's office 01-02-2007 |

Taken in exercise room looking south 01-02-2007 |

Hanging light fixtures in Exercise Room of Wellness & Fitness Center 01-02-2007 |

Looking towards the northeast corner of Wellness & Fitness Center Exercise Room - Grills to air ducts 01-02-2007 |

Suspended ceiling going into Aerobics Room - light installed 01-02-2007 |

Physical Therapy area looking northeast. Workmen from millwork company preparing to install cabinetry. 01-02-2007 |

Physical Therapy area looking back towards east wall. Cabinetry being installed. 01-02-2007 |

Drywall being finished in northwest stairwell. 01-02-2007 |

01-02-2007 |

Passage way between swimming pool & lockers, looking north into Wellness Center 01-08-2007 |

New windows in north wall of pool area 01-08-2007 |

Looking west from the free weight area to east wall of Wellness Center 01-08-2007 |

Looking towards the north west in the Wellness Center 01-08-2007 |

Flooring laid out in aerobics room for Wellness Center 01-08-2007 |

Close up of flooring in aerobics room - ready for installation 01-08-2007 |

Looking south in Wellness Center 01-08-2007 |

Therapy area, Speech office in background 01-08-2007 |

Aaron Proctor's office and Therapy area looking northwest 01-08-2007 |

Hallway outside of Chapman Wellness Center looking south 01-08-2007 |

Basement, long term storage area 01-08-2007 |

Cabinetry and workspace for Barb Rollman in Materials Management Department 01-08-2007 |

Sheet rock on basement wall towards existing east wing basement 01-08-2007 |

Cabintery in Therapy area 01-08-2007 |

Education Center on second floor looking southwest 01-08-2007 |

Bathroom tile being installed on second floor 01-08-2007 |

Reception area window for administrative secretary on second floor 01-08-2007 |

Looking up from Atrium 01-12-2007 |

Reception desk for Chapman Wellness Center ready for installation 01-12-2007 |

Window to pool area from the Receptionist's Area 01-12-2007 |

Chapman Wellness Center looking north 01-12-2007 |

Chapman Wellness Center looking out from the free weight area 01-12-2007 |

Newly installed aerobics room floor 01-12-2007 |

Tiled area for water fountain area in Chapman Wellness Center 01-12-2007 |

Aerobics Room in Chapman Wellness Center 01-12-2007 |

Laundry area in Basement looking at air handling equipment 01-12-2007 |

Laundry Area in Basement - Dryers will be placed on the right 01-12-2007 |

Maintenance Room - doors installed on the mechanical room in basement 01-12-2007 |

Entrance to the Maintenance Area - doors installed 01-12-2007 |

Basement Hallway looking north 01-12-2007 |

Marketing office on second floor - ceiling grid and lights being installed 01-12-2007 |

Education Center looking west - ceiling grids installed and painting nearing completion 01-12-2007 |

Light in ceiling in Atrium 01-12-2007 |

Close up of lights in ceiling in Atrium 01-12-2007 |

Men's bathroom on second floor - wall and floor tile installed 01-12-2007 |

Concrete curbing for parking lot poured near entry to Chapman Wellness Center 01-12-2007 |

Preparation for pouring concrete drainage swale on north side of the building 01-15-2007 |

Cabinetry in the Hydrotherapy Room in Therapy Area 01-15-2007 |

View from second floor of new addition, looking north 01-15-2007 |

Removing doorway from former pool storage area 01-15-2007 |

Entry tile in atrium of the new wing 01-16-2007 |

Note quarry tile base moulding has been laid in hallway outside Chapman Wellness Center 01-16-2007 |

Men on stilts putting in celining grid in administrative hallway on second floor 01-16-2007 |

Tile in atrium of new wing 01-17-2007 |

Aerobics room floor in Chapman Wellness & Fitness Center - flexible baseboard in place 01-17-2007 |

Looking past education receptionist area 01-17-2007 |

Ceiling grid on second floor 01-17-2007 |

Taken from second floor looking at tiled floor in atrium 01-17-2007 |

Ceiling tiles being installed on first floor near lobby 01-17-2007 |

Pouring concrete in January - drainage for building 01-25-2007 |

Athletic track being laid in Chapman Wellness Center 01-25-2007 |

New resilient floor in free weight area in Chapman Wellness Center 01-25-2007 |

Doors being hung on Chapman Wellness Center 01-25-2007 |

Installation of sign in counter for Chapman Wellness Center 01-25-2007 |

Inflated duct sock for heating and air conditioning system 01-25-2007 |

Carpet being laid in the therapy area of the north east wing 01-25-2007 |

Carpet being laid in the therapy area of the north east wing 01-25-2007 |

Carpet being laid in the therapy area 01-25-2007 |

Gray sealer on the floor of basement 01-25-2007 |

Gray sealer on the floor in the basement 01-25-2007 |

Nearing completion with gray sealer in Central Supply storage room 01-25-2007 |

Bathroom on second floor nearly complete 01-25-2007 |

Lavatory installed in bathroom on second floor 01-25-2007 |

Women's bathroom on second floor 01-25-2007 |

Women's bathroom on second floor 01-25-2007 |

Water coolers outside Education Center on second floor 01-25-2007 |

Hallway on second floor 01-25-2007 |

Hallway on second floor 01-25-2007 |

Elevator on second floor above atrium - ceiling complete 01-25-2007 |

Elevator on second floor above atrium - ceiling complete 01-25-2007 |

Ceiling complete on second floor 01-25-2007 |

Ceiling complete on second floor 01-25-2007 |

Education Center on second floor - ceiling nearly complete 01-25-2007 |

Nutrition Center for Education Center on second floor 01-25-2007 |

Floor complete in Marketing/Foundation office on second floor 01-25-2007 |

Ceiling complete in the Human Resource area 01-25-2007 |

Cement Trucks working in January 01-25-2007 |

Concrete operation picture taken from office of CFO 01-25-2007 |

Hanging double entry doors in the hallway between the east wing and the new wing 01-25-2007 |

Hanging double entry doors in the hallway between the east wing and the new wing 01-25-2007 |

Therapy Service space 01-29-2007 |

Physical Therapy Director's office and Check-in Area 01-29-2007 |

First Floor Hallway 01-29-2007 |

Concrete swail being installed 01-29-2007 |